Document Page: First | Prev | Next | All | Image | This Release | Search
File: 082696_doc1_561.txt
means
It could be transported by MAC, Marine Air or surface
4 Permanent Facility For a permanert facility, existing
equipment would have to be dismantled rep~cked, transported, and
set up in S~A. Tear down and set up time would take approximately
three weeks
D If deployed in any configuration, the T&EU should ramain under
operatlona~ control of CO)~AARCORL0GBASES as a support unit The
un~t would require an initial float of new masks to swap with units
being tested. Replenishment of the float would be directly from the
forward deployed T&EU to T&EU Materiel Division, Albany T&EU Unit,
Albany, would coordinate repair of unserviceable masks. (Additional
support could be obtained from sustainment stocks witnin 1st FSSG
SMU.)
~WC()MME~DATI0N: That a shelter/container version be built and
provided as a support unit to I MEF, under operational, technical
and administrative control' of COMMARC0RLOGBASES
A A message be sent to ~QMC and USMACCENT advising them of the
need for mask retest i ng
E. If the recommendation is supported by I MEF, that a liaison
visit be conducted to locate and coordinate water, power and
personnel require,nents as well as to develop with I MEF a concept of
operations.
ACTT~~ fl~~Tc\~~~
Mr ~. J. ~art, Storage and Distribution Directorate
C~0-3 W. D. }{artzell , Integrated Logistics Support Directorate
Document Page: First | Prev | Next | All | Image | This Release | Search