means

It could be transported by MAC, Marine Air  or surface

    4   Permanent Facility   For a permanert facility,  existing
equipment would have to be dismantled  rep~cked,  transported, and
set up in S~A.  Tear down and set up time would take approximately
three weeks

D    If deployed in any configuration, the T&EU should ramain under
operatlona~ control of CO)~AARCORL0GBASES as a support unit   The
un~t would require an initial  float of new masks to swap with units
being tested.  Replenishment of the float would be directly from the
forward deployed T&EU to T&EU Materiel Division, Albany    T&EU Unit,
Albany, would coordinate repair of unserviceable masks.    (Additional
support could be obtained from sustainment stocks witnin 1st FSSG
SMU.)

~WC()MME~DATI0N:  That a shelter/container version be built and
provided as a support unit to I MEF, under operational,  technical
and administrative control' of COMMARC0RLOGBASES

A    A message be sent to ~QMC and USMACCENT advising them of the
need for mask retest i ng

E.   If the recommendation is supported by I MEF, that a liaison
visit be conducted to locate and coordinate water, power and
personnel require,nents as well as to develop with I MEF a concept of
operations.

ACTT~~ fl~~Tc\~~~

Mr  ~.  J. ~art, Storage and Distribution Directorate

C~0-3 W.  D. }{artzell , Integrated Logistics Support Directorate