Document Page: First | Prev | Next | All | Image | This Release | Search
File: 082696_doc1_562.txt
Subi: NBC DLF~NSE TEST AND EVALUATION UNIT. WA SUPPORT
BACkGROUND.
1 . The T&EU Testin~ of Field Protective Masks prior to MEU (SOC)
deployment arid unon their return durin~ FY 90 identif led a
COnS 1 Stent f ai lure rate. Mask tested for operati on Desert Shleld
are sub ~ ect to the same de ~ radat Ion when in use.
2. Seventh MEB masks were not tested prior to den 1 oymen t.
However. 13.41% new~tested masks were shinped to 7th MEB (SWA)
for swan-out. To date 4 ~H£~ bf these masks have been returned to
MCLB Albany.
DISCUSSION.
1. The T&EU East test statistics ol Two MEU (SOC) durin~ FY 90.
prior to and upon return from deployment. identi ~ led a consistent
failure rate of percent. Prior to the MEU (SOC) deploy-
ment al 1 1: al led mask were rep laced with new tested masks. The
same failure rate alter deployment identifies a need to retest
masks I or serv 1 ceab I I I ty a I ter 6 months.
-`I
2. Prior to unit denloyment to SVQA. identified a failure rate of
~`he fai lures were replaced0 these masks have
beer in use lor 6 months. Ihe !th MEB denloved prior to havin~
the 1 r ma ks tested. MCLB Al banv imp 1 emen ts a swap-out pro ~ram
Document Page: First | Prev | Next | All | Image | This Release | Search