Subject: SPECIAL INFORMATION FOR INSTALLATION AFTER ACTION REPORT        

Unit: 1ST ID      

Parent Organization: VII  CORPS  

Box  ID: BX001008

Folder Title: DESERT STORM AFTER ACTION REPORTS                                                               

Document Number:          4

Folder Seq  #:         11






                                       UNCLASSIFIED
                                                                          C)4/19/91
                                     JULLS LONG REPORT

           1. (U) JULLS NUMBER, 21832-16777 (00367), Submitted by RILEY
           AFZN-HC-GA, CPT Butler, 856-2823, (913)239-2B23.

           2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 12/C)3/9C).

           3. (U) KEYWORDS: No keywords..

           4. (U) TITLE: Logistics: Transt Deployment rail operations bus
           requirements

           5. (U) OBSERVATION:      Bus assignment and utilization dLtrinc3
           rail operations is  poorly managed.

           6. (U) DISCUSSION:       HO Cmd (HHC, USAG) was ta5ked for two 44
           pa;< bus drivers to support DOL transportation rail opns. Each
           morning the drivers are told that HHC, USAG already has buses
           (which is incorrect). Replacement Co has one and the Band has
           one. Both use theirs regularly. If rail opns is a priority
           mission why do the drivers have problems eve   ry morning when they
           attempt to get buses from TMP. Also, why give buses to each
           MSC/BN during rail opns if HHC, USAG is doing the mission.

           7. (U) LESSON LEARNED:        Prioritize the use of buses.
           Aggressively plan for the number of buses required to support
           all missions. If shortfalls occur, issue them based on priority
           for rail load, and/or contract +or more buses.

           S. (U) RECOMMENDED ACTION:        1. DCC; Establish priorities
           +or bus assignments.
               2.    (a) Dedicate two buses (that are operational) to DOL
           trans rail apns.
              (b) Give the MSC/Bns buses after rail cons when their
           training cycle begins and when they need the buses to get to the
           ranges and other training sites.

           9. (?) COMMENTS:



           --- (U) SUBJECT:   LOGISTICS


 PLANNING

               (U) Action managed by: LOCAL, action worked by:       RAP number-.
                Lesson distributed by: LOCAL.











                                        UNCLASSIFIED
                                           @-IY3

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996