                                       UNCLASSIFIED
                                                                       04/19/91
                                     JULLS LONG REPORT

            1. (U) JULLS NUMBER: 32942-93168 (00312), submitted by RLY
            AFZN-DL-S-SB, Ms Robinson, 856-2011, (913)239-2011.

            2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 02/06/91.

            3. (U) KEYWORDS: PLANNING, ORDERS/GUIDANCE, RWO (REAL WORLD OPS),
            USA (US ARMY), ACTIVE COMPONENT, C2 (COMMAND AND CONTROL),
            LOGISTICS, UNFAVORABLE, INTEROPERABILITY, CRIT3 (IMPORTANT PROBLEM).

            4. (U) TITLE- Logistics: DOL/IPECO: Unit Housekeeping Prior to
            Deployment

            5. (u) OBSERVATION: Unit housekeeping/maintenac6 was found to be
            worse than expected with many basic cleanliness functions not
            done upon deployment.

            6. (u) DISCUSSION: Although it was expected that the units
            would not have the time to perform last minute housekeeping
            chores, it was not envisioned that the barracks areas would
            require so much work. Subsequently, the IPECO planning should
            include personnel and time for this function.

            7. (u) LESSON LEARNED: Proper housekeeping/maintenance of the
            barracks will make it easier to turn over to reserve units or
            upon redeployment.

            S. (u) RECOMMENDED ACTION: A. Turn in all linen found in t  .he
            unit +or cleaning. Include pillows and mattress covers.
                B. BOX Up unit linen. This will preclude exposure to dust
            and dirt. Also, it makes the linen easier to move if necessary.
                C. Allot time for basic cleaning of barracks to include
            bathrooms, dayrooms, and orderly rooms. IPECO will clean floors
            but was and buff floors.
                D. Insure that barracks items are pulled from
arracks. When
            barracks are issued to reserve units accountability can be
            difficult if items are spread out everywhere.

            9. (u) COMMENTS:    none




                (U) SUBJECT: LOGISTICS


                (U) INTEROPERABILITY: PLANNING


                (U) Action managed by: LOCAL, action worked by:   RAP number:
                 Lesson distributed by: LOCAL.







                                       UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996