                                                                     C)4/19/91
                                   JULLS LONG REPORT


          1. (U) JULLS NUMBER: 30533-7oe76 (00062), submitted by RILEY
          AFZN-EN-YO, CPT WOODS, 856-4210, (913)239-421o.

          2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 02/C)6/9'.

          3. (U) KEYWORDS: PLANNING, RWO (REAL WORLD OPS), USA (US ARMY),
          ACTIVE COMPONENT, LOGISTICS, TRANSPORTATION, AIRLIFT, AUTHORITY,
          INTEROPERABILITY.

          4. (U) TITLE- C-2: LOGISTICS: Lack of Support +or DACG Mission

          5. (U) OBSERVATION:   At the outset of the DACG, no one within
          the Division provided the backing needed to establish
          credibility +or the rest of the operation.

          6. (U) DISCUSSION: As a result, chalk commanders of advance
          party units literally walked all over the DACG OICs and NCOS. Of
          particular problem were those chalk commanders who had operated
          the DACG when other units from the Division deployed in late
          October 1990. Those officers had done -the DACG a certain way-,
          and, when they deployed their units, they demanded that the
          system run exactly the way they had ran it. This was extremely
          difficult because no one had used a central POM and cargo
          inspection facility.

          7. (U) LESSON LEARNEI): The DACG OIC must brief as soon as
          possible that person within the Division who will decide all
          conflicts. That person must be ready to back up the position of
          the DACO officers when problems arise with chalk and unit
          commanders.


          B. (U) RECOMMENDED ACTION: That future deployment planning
          identify chain of command +or DAOG operationlpersonnel,

          9. (U) COMMENTS:    none



          --- (U) SUBJECT: COMMAND & CONTROL


              (U) !NTEROF'ERABILITY: PLANNING

anaged by: LOCAL, action worked by:   RAP number,.
               Lesson distributed by: LOCAL.













                                     UNCLASSIFIED


                                         @-7

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996