Document Page: First | Prev | Next | All | Image | This Release | Search
File: aaafa_01.txtSUBJECT: CIVIL ENGINEERING, FIRE PROTECTION STATUS ROUTINE RAASZYUM RHIDFKA0102 3411248- --RHDIBFF. ZNY R 071430Z DEC 90 FM 1706 AREFW (P) // DE // TO RHIUFAA/HQ USCENTAF FWD // DE/LG // INFO RUCUAAA/HQ SAC OFFUTT AFB NE // SBS/DER/LG // RHDIAAA/HQ USCENTAF LANGLEY AFB VA // DE/LG // BT SUBJECT: ENGINEERING/FIRE PROTECTION/STATUS 1. (U) ENGINEERING A. PRIME BEEF: CURRENT: 57 PERSONNEL (ONE ON EMERGENCY LEAVE BACK TO STATES). THREE POWER PRO TECHNICIANS ARRIVES THIS WEEK. PROJECTED: 4 B. WATER STATUS: INSTALLED. WE ARE CURRENTLY DOING BULK CHLORINATION TO MAKE WATER POTABLE BUT STILL WAITING ON SUPPORT KIT FOR ROWPU. ONE SMFTS HAS BEEN REPAIRED AND ONLY HAVE ONE 40 FOOT TRAILER. ONE OF OUR SMFTS BLEW OUT AT A SEAM ON 26 NOV. IT HAS ALSO BEEN REPAIRED BUT STILL LEAKS. RELIABILITY IS QUESTIONABLE. QTY/DAY LOCAL: BOTTLE DRINKING WATER UNLIMITED PAGE 2 RHIDFKA0102 DIST SYS STATUS: INSTALLED TREATMENT STATUS: INSTALLED-WAITING ON FILTERS AND SUPPORT KIT. ROWPU: ONE ON SITE/NOT OPERATIONAL ERD STATUS: NOT REQ'D STORAGE CAPACITY: SIX 20 KGAL BLADDERS ON SITE AND INSTALLED. SANITARY STATUS: LOCAL SYS: NOT AVAILABLE FIELD SYS: FOUR FIELD UNITS/INSTALLED/OPERATIONAL SHOWER/SHAVE STATUS: 4 INSTALLED/OPERATIONAL LOCAL SYS AVAIL/QTY: NONE WASTE MGMT SYS: LAGOON CONSTRUCTED. DISTRIBUTION SYSTEM COMPLETE. C. POWER STATUS: HIGH VOLTAGE SYSTEM IS OPERATIONAL. PAGE: 1
Document Page: First | Prev | Next | All | Image | This Release | Search