JUSTIFICATION AS PREVIOUSLY SUBMITTED, LONG-TERM PRESENCE AT THIS
LOCATION (INDEPENDENT OF THIS OPERATION) JUSTIFIES FACILITIES COM-
MENSURATE WITH THOSE AT MASIRAH.  TENTS AND FIELD UNITS WILL BE
UNSUPPORTABLE BEFORE PERMANENT FACILITIES ARE BUILT UNLESS STARTED
SOON.  REQUIREMENT:  PERMANENT DINING FACILITY/JUSTIFICATION: AS
ABOVE FOR SHOWER/SHAVE/LATRINE FACILITIES.  REQUIREMENT:  COMMERCIAL
LAUNDRY FACILITY/JUSTIFICATION:  FIELD LAUNDRY USE FOR EXTENDED
PERIODS IS NOT DESIRABLE.  LIMITATION ON USE OF PERSONAL CLOTHING
PLUS RESTRICTIONS ON OFF-BASE LAUNDRY USE FOR U.S. IDENTIFIABLE
CLOTHING MAKE ALTERNATE LAUNDRY NECESSARY.  HAND WASHING IS NOT SUIT-
ABLE ANSWER FOR LONG TERM.  MINIMUM REQUIREMENT IS LIMITED U-WASH-IT
COMMERCIAL GRADE WASHERS AND DRYERS.  REQUIREMENT:  NONPOTABLE WATER
SUPPLY/JUSTIFICATION:  NONPOTABLE WATER FOR SHOWERS, LATRINES, AND
LAUNDRY IS CURRENTLY TRUCKED TO CAMP BY CONTRACT.  SUITABLE NONPOT-
ABLE WATER SOURCE IS LESS THAN A MILE AWAY AND COULD BE PIPED TO CAMP.
INVESTMENT.  WELL WORTH IT FOR LONG TERM PRESENCE HERE.  REQUIREMENT:
SEWAGE:  HOLDING TANK/JUSTIFICATION:  SEWAGE IS CURRENTLY PUMPED FROM
THE LATRINES BY CONTRACT.  TRUCKS MUST OPERATE IN CONGESTED AREA AND
UNPLEASANT ODOR IS UNAVOIDABLE IN CAMP.  FOR SANITARY REASONS, REMOTE
TANK CONNECTED BY PIPING IS NECESSARY TO IMPROVE SANITATION.  TANK



PAGE06 RHIBPKA0794
COULD BE USED FOR PERMANENT LATRINE FACILITIES AS WELL.  REQUIREMENT:
ELECTRICAL TIE-IN TO BASE POWER PLANT/JUSTIFICATION:  U.S. BUILT
POWER PLANT SITS UNUSED OPPOSITE TENT CITY.  PLANT TIED IN TO BASE
POWER GRID IS NOT NEEDED.  WITH APPROPRIATE CONVERSION AND
DISTRIBUTION, PLANT COULD SUPPLY TENT CITY AND ALLOW 750 KW GENERA-
TORS TO ACT AS BACK UP VICE PRIMARY POWER SYSTEM.  ANTICIPATED
REQUIREMENT:  PARKING APRON/TAXIWAY FOR MUNITIONS UPLOAD OF CARGO
ACFT/JUSTIFICATION:  INITIAL REQUEST TO CE IS FOR AM-2 MATTING FOR
PARKING TWO C-141 AND TWO C-130 ACFT FOR SIMULTANEOUS MUNITIONS UP-
LOAD FROM STOCKPILES IN MUNITIONS STORAGE AREA.  LAYOUT AND DETAILED REQUIREMENTS ARE BEING DEVELOPED MORE TO FOLLOW.

BT