AND PRIME POWER PLANT OPERATION, AS WELL AS DISTRIBUTION OF ASSETS
FROM ONE END OF THE BASE TO THE OTHER, REQUIRE 10 542X2 PERSONNEL.
8 ARE ON HAND, ONE KORE IS APPROVED BUT NOT YET ON HAND.  REQUIREMENT
6 EA 551XX PERSONNEL/JUSTIFICATION: LARGE SCALE EQUIPMENT OPERATIONS
TO CONSTRUCT MUNITIONS STORAGE ARE EXPANSION, C-130 DISPERSED PARK-
ING AREA AND TAXIWAYS AND DISPERSED FUEL BERMS ARE REQUIRED. ADDI-
TIONAL, EQUIPMENT OPERATORS ARE REQUIRED TO KEEP THESE PROJECTS PRO-
CESSING.  25 ARE ON HAND, FOUR ARE ENROUTE AND DUE 18 OCTOBER, THREE
ARE BEING SOURCED BY CENTAF.   REQUIREMENT: 44 AIR CONDITIONING UNITS
JUSTIFICATION: 27 ADDITIONAL REQUIREMENTS EXIST IN TENT CITY AND
AROUND THE BASE TO COOL TENTS, GPS, AND ESC SHELTERS FOR TAC AND MAC
MAINTENANCE, MAC/DO, RM, SECURITY POLICE, AND AERIAL PORT.  DUE TO SERVICING AND BREAKDOWN FREQUENCY AND LACK OF ADEQUATE WRSK, A 10
PERCENT BACK UP LEVEL IS REQUIRED (34 MORE A/C UNITS). 314 INSTALLED
17 BACK UP ON HAND, 44 ADDITIONAL REQUIRED.  REQUIREMENT: 3 100 KW
GENERATORS? JUSTIFICATION: EXPANDED TAC/MA,  AERIAL PORT, AND MAC/MA
AND DO FACILITIES TO ALLEVIATE OPERATIONAL RESTRICTIONS REQUIRE
INCREASED ELECTRICAL POWER.  11 EA 100 KW GENERATORS ON HAND.
REQUIREMENT: 1 EA 60 KW GENERATOR/JUSTIFICATION: POWER REQUIRED FOR


PAGE04 RHIEFKA0794
TWO GPS FOR RM TO USE FOR BASE SUPPLY.  15 60 KW GENERATORS ON HAND.
REQUIREMENT:  1 EA ESC COMMON/JUSTIFICATION: REQUIRED HARD SHELTER
FOR ISSUE OF MODERATE QUANTITIES OF WEAPONS AND AMMUNITION BY
SECURITY POLICE AT TENT CITY DURING INCREASED THREATCON.  MUNITIONS
AND WEAPONS ARE SEPARATELY STORED AT OPPOSITE ENDS OF BASE AT HOST
NATION DIRECTION.  THIS FACILITY IS REQUIRED TO MEET SECURITY
REQUIREMENTS. 21 EA ESC SHELTERS (ALL TYPES) ON HAND. REQUIREMENT:
VEHICLE WRSK/JUSTIFICATION: PARTICULAR PROBLEMS EXIST WITH CIVIL
ENGINEERING SPECIAL PURPOSE EQUIPMENT.  SEALS AND OTHER HYDRAULIC
SYSTEM COMPONENTS HAVE FAILED DUE TO LONG INACTIVITY OF EQUIPMENT
DURING STORAGE. AIR FILTERS (FOR EARTH MOVING EQUIPMENT LIKE DOZERS.
GRADERS, ESPECIALLY) ARE UNAVAILABLE FOR FREQUENTLY NEEDED REPLACE-
MENT IN THIS HIGH DUST/SAND ENVIRONMENT.  REQUIREMENT: 100KW AND 60
KW WRSK/JUSTIFICATION: WRSK SUPPLIED IS INCOMPLETE.  BELTS ARE STILL
ONLY AVAILABLE THROUGH HOME STATION.  REQUIREMENT: HARVEST FALCON
WRSK (VARIOUS TYPES) ? JUSTIFICATION: WRSK RECEIVED IS INCOMPLETE
SHOWER/SLAVE UNIT WRSK LACKS GASKETS AND VALVES. 9-1 KITCHEN WRSK
LACKS WRSK FOR REFER UNITS AND TILT GRILLS.  NO WRSK RECEIVED FOR
LATRINE UNITS.  TENT ZIPPERS AND FLOORS ARE FAILING WITH NO WRSK
SUPPLIED. REQUIREMENT:  PERMANENT SHOWER/LATRINE/SHAVE FACILITIES.