Document Page: First | Prev | Next | All | Image | This Release | Search

File: 082696_doc1_545.txt
Page: 545
Total Pages: 652



 1.  Current status, M17A2 Masks:

     NSN                     ALBANY      BARSTOW        TOTAL

     4240-01-143-2017(XS)     2,500           0         2,500

     4240-01-143-2018(S)     20,240         740        20,980

     4240-01-143-2019(M)      2,191         542         2,733

     4240-01-143-2020(L)      3,204       6,963        10,167

 2.  To date we have received approximately 5,000 rebuilds from
 Pine Bluff.  This system is working well and is supporting the
 T&EU swap out for machine failures.

 3.  Have also received the majority of the masks that were
 exchanged with 1st NEB.  Many of these have been returned to stock
 and some are already reflected in the numbers above.   Some of
 those that failed have been sent to Pine Bluff for rebuild.

 4.  As depicted above, our stock picture is fairly good but should
 get much better.  We have yet to receive the exchanged masks from
 7th MEB (approx 16,000).  If we don't get anything from them soon,
 we will prepare a message requesting status.

 5.  5th and 6th MEBs have been 100 percent tested by~the T&EUs.


                                                 ---I #`~#    A-&c-
                   ¼             7~c
  joY4      WY      p7).u    A            &*~;-               WA
  7oyr   7 ~g~     ¼-    ~~½/   ½~~y   /~~           ~ wY

                                                      ½           7;?;
                                                       ;~Y)       ½


Document Page: First | Prev | Next | All | Image | This Release | Search