Document Page: First | Prev | Next | All | Image | This Release | Search

File: 961031_950719_73134260.txt
Page: 73134260
Total Pages: 167

REPORT ON HABBANIYAH

Filename:73134260
SUBJECT: REPORT ON HABBANIYAH
PATHFINDER RECORD NUMBER: 34260
GENDATE:         950605
NNNN
TEXT:            
ENVELOPE RATMCIAB YEKDQA 7531 3322158-MIDO--YEKDQX
ZNY MMIDO ZNZ1
ZKZK RR AAZ DE
HEADER R 282158Z NOV 90 ZYS
FM SSO DIA/AIRES
TO CINCUSNAVEUR
SSO USEUCOM
SSO CINCCENT
FIC CATIS
SSO CINCSOC//J2-OI//
USAINTCTREUR
SSO IRC CATIS
BRFINK MHE
SSO USAFE
SSO SAC
SAC PACER
ETUTUSAREUR
FOSIF WPAC
SSO ITIC-PAC
PACAF IDHS
SSO IPAC
CSG PACAF
SSO FTD
FICPAC CATIS
AFIS//INOAD//
SAFE
ETUT FWD
NAVSTKWARCEN
CENTAF FWD
CMO 513 MI BDE
ESC CATIS
ESC AMHS
CATIS MACDILL
ZEM
CONTROLS 

[   (b)(2)   ]
[   (b)(2)   ]
SECTION 01 OF 01 SECTIONS
BODY MSGID/IIR/[   (b)(2)   ]
RPTID/SUPIR/[   (b)(2)   ] //
ITEMTYP/SIGNIFICANT ACTIVITY OR OB ITEMS//
ITEM/003/HABBANIYAH POSS CW PROD FACILITY II/
[   (b)(2)   ]          
/CTY:IZ/Y//
LOC/GEO:332841N0434014E//
[   (b)(2)   ]
STATACT/OPR//
SUBJECT:  PRODUCTION-RELATED ACITIVITY
RMK/ON 21 NOVEMBER, PRODUCTION-RELATED ACTIVITY WAS OBSERVED AT 
THE
/WESTERN PROBABLE PRECURSOR PRODUCTION AREA. ONE OF TWO LARGE
/LIQUID TRANSPORT TRUCKS (WITH DARK-TONED SQUARES ON THE TANK),
/PROBABLY FROM THE SUPPORT AREA (AREA F) AT SAMARRA CW RESEARCH
/PRODUCTION AND STORAGE FACILITY [   (b)(2)   ], AND ONE STAKE BED
/TRUCK HAD ARRIVED IN THE AREA. NO CARGO WAS DISCERNIBLE IN THE
/STAKE BED TRUCK. ONE POSSIBLE FIRE TRUCK WAS ALSO PRESENT. NO
/ADDITIONAL CYLINDERS APPEAR TO HAVE BEEN REMOVED FROM THE STORAGE
/AREA ADJACENT TO THE WESTERN PROBABLE PRECURSOR PRODUCTION AREA
/SINCE [   (b)(1) sec 1.3(a)(4)   ] 12 NOVEMBER. ON 12 NOVEMBER, 
AT /LEAST 20 CYLINDERS HAD BEEN REMOVED FROM THE STORAGE AREA 
SINCE /EARLY OCTOBER. 
/
/ONE POSSIBLE TRUCK-MOUNTED CRANE HAD DEPARTED FROM THE ENTRANCE 
TO
/THE SECOND WAREHOUSE-STORAGE BUILDING SINCE 12 NOVEMBER. THE HIGH
/LEVEL OF ACTIVITY OBSERVED SINCE MAY AT THIS WAREHOUSE-STORAGE
/BUILDING CONTINUED TO BE HIGHER THAN AT THE OTHER THREE
/WAREHOUSE-STORAGE BUILDINGS.       
/
/CONSTRUCTION ACTIVITY CONTINUED IN THE EASTERN PROBABLE PRECURSOR
/CHEMICAL PRODUCTION AREA. A TRUCK-MOUNTED CRANE HAD ARRIVED NEXT
/TO A CHEMICAL STORAGE TANK, PROBABLY TO RESUME THE INSTALLATION 
OF
/THE PIPE GALLERIES. THE VERTICAL SUPPORTS TO CONNECT THE PIPE
/GALLERIES TO THIS STORAGE TANK HAD BEEN ERECTED BY 12 NOVEMBER.
/WHEN COMPLETED, THE PIPE GALLERIES WILL CONNECT THE CHEMICAL
/STORAGE TANKS WITH THE PRODUCTION-PROCESSING BUILDINGS.        
/
/ANALYST -- [   (b)(6)   ]          (U)
/
//
[   (b)(2)   ]



#7531








INFODATE:        0
 



 

 



Document Page: First | Prev | Next | All | Image | This Release | Search