Subject: SPECIAL INFORMATION FOR INSTALLATION AFTER ACTION REPORT        

Unit: 1ST ID      

Parent Organization: VII  CORPS  

Box  ID: BX001008

Folder Title: DESERT STORM AFTER ACTION REPORTS                                                               

Document Number:          4

Folder Seq  #:         11






                                       UNCLASSIFIED
                                                                       04/19/91
                                     JULLS LONG REPORT


           1. (U) JULLS NUMBER: 32938-69715 (00304), submitted by RLY
           AFZN-DL-S-PB, Ms Robinson, 856-2011, (913)239-2011.

           2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 02/06/91.

           3. (U) KEYWORDS: RWO (REAL WORLD OPS), USA (US ARMY), ACTIVE
           COMPONENT, LOGISTICS, POL (PET, OILS, AND LUB), UNFAVORABLE,
           ACCOUNTABILITY, CRIT3 (IMPORTANT PROBLEM).

           4. (U) TITLE: Logistics: DOL/IPECO: Underground Fuel Not
           Properly Accounted +or by Unit

           5. (u) OBSERVATION: Lack of accountability of fuel in
           underground tanks because units deployed with strapping charts.

           6. (u) DISCUSSION: Strapping charts used to convert inches of
           depth to gallons of capacity had been rail loaded. These charts
           are computed based on the design of each individual type of
           tank. They are not interchangeable exept with like tanks. No
           master copy of charts exist on this installation. In order to
           ascertain an accurate quantity that could be documented on a DA
           3161 lateral transfer, differing methods had to be used which
           are not entirely correct.

           7. (u) LESSON LEARNED: Master file of strapping charts should
          .be -Filed at installation level to attain accurate underground
           fuel tank supplies.

           S. (u) RECOMMENDED ACTION: A. A master    file be maintained on
           the installation of all charts.
                B. Units should be instructed in the operations order that
           charts are necessary to have on hand to transfer accountability
           of fuel and are not interchangeable.
                C. Charts and measuring gauges that are designed for that
           specific tank should remain in the pumpholise at all times.

           9. (u) COMMENTS:     none



           ---  (U) SUBJECT: LOGISTICS

                (U) INTEROPERABILITY: PLANNING


                (U) Action managed by: LOCAL, action worked by:   RAP number:
                Lesson distributed by: LOCAL.











                                       UNCLASSIFIED


                                         @- //- p

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996