                                                                      04/19/91
                                   JULLS LONG REPORT


          1. (U) JULLS NUMBER: 32549-21921 (00225), Submitted by RILEY
          PTM-C, MR WALTER, 856-2225, (913)239-2225.

          2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 02/C)6/91.

          3. (U) KEYWORDS- RWO (REAL WORLD OPS), USA (US ARMY), ACTIVE
          COMPONENT, INFORMATION MANAGEMENT, LIAISON, REPORTING, READINESS,
          PLANS, EQUIPMENT, ADP/COMPUTERS, HARDWARE, SOFTWARE, FAVORABLE,
          ACCOUNTABILITY, CAPABILITY, COORDINATION, SUITABILITY, PLANS, CRIT2
          (SERIOUS PROBLEM), NBC EQUIPMENT.

          4. (U) TITLE: LOGISTICS: UNIT CDE INVENTORY DATA


          5. (U) OBSERVATION: CDE inventory data received +ram units
          subordinate to Division were in many cases inaccurate.

          6. (U) DISCUSSION: Many Fort Riley units did not take    the
          quarterly CDE report required by FR 725-1 seriously. As a
          result decisions about the proper use of funds to +ill CDE
          short-Falls could not be made without requiring two additional
          inventory iterations, one of them during non-duty hours.
          Accurate submission a+ quarterly CDE status reports is essential
          to unit readiness.
               63/NBC did much to help correct the problem:
                  CDE Reports received from the units were computerized
          and bumped against a spreadsheet program to verify authorization
          levels.
                 Computer program then computed overages and shortages,
          monitored comulative changes in divisional CDE stock levels, and
          calculated the funds required to fill unit CDE shortages +or
          MSCs and as well as centrally managed CDE shortages +or the
          installation.
                  Original software (IBM) was obtained through the Army
eet local needs.


          7. (U) LESSON LEARNED- Command   emphasis is required to ensure
          that quarterly CDE inventories are performed thoroughly and
          accurately.

          B. (U) RECOMMENDED ACTION: CG: Make CDE inventories an item
          +or command emphasis.

          9. (?) COMMENTS:



              (U) SUBJECT: LOGISTICS


              (U) INTEROPERABILITY: PLANNING


              (U) Action managed by: LOCAL, action worked by-    RAP number:
               Lesson distributed by: LOCAL.


                                     UNCLASSIFIED

                                       @ -//s

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996