Document Page: First | Prev | Next | All | Image | This Release | Search
File: 011696_103_6_112.txt
TG No. 144 August 1987
APPENDIX E
VENTILATION DESIGN
Table. Spray Paint Ventilation Rates/Flow Rates
(cfm/sq ft face area)
Air Spray Airless Spray
Design Operating Range Design Operating Range
Spray Cabinet*
(4 sq ft face 200 175 - 225 125 100 - 150
>4 sq ft face 150 125 -4 175 100 75 - 125
Booth
Vehicular 100 75 - 125 75 75 - 100
Walk-in 150 125 - 175 100 75 - 125
*Cabinet located above floor, usually at waist level. Worker's face does not
enter the cabinet.
Note:
The values specified in this table are equal to or greater than those listed
in table G-10, 29 CFR 1910.94.
E-1
Box ID = BX000000
Unit = VII CORPS
Parent Organization = ARCENT
Folder Title = PORT OPERATIONS CARC PAINTING POLICY
Subject = ARMY REGULATION 11-34 (RESPIRATORY PROTECTION PROGRAM
Document Number = 103
Image file name = 00000196.tif
Document Page: First | Prev | Next | All | Image | This Release | Search