Document Page: First | Prev | Next | All | Image | This Release | Search
File: aaavg_03.txtROUTINE PAGE: 3 (4) FIVE POWER PRO AND ONE HEAT TECHNICIAN. POWER FLANT IS NOW OPERATION TENTY-FOUR HOUR PERDAY WITH ONLY FOUR POWER PRODUCTION PERSONNEL ASSIGNED. WE HAVE NOT BEEN ABLE TO CHECK OUT ALL PORTABLE GENERATORS AND IF A GENERATOR BREAKS. OUR POWER PRODUCTION PERSONNEL WILL BE SERVERLY TAXED. WITH REGARDS TO HEAT TECHNICIAN, WE CURRENTLY HAVE NONE ASSIGNED BUT SITLL HAVE DIESEL FIRED BOILERS FOR SHOWERS AND DINING HALL. (5) NOE 20K WATER BLADDER TO REPLACE LEAKING BLADDER. (6) WE ARE MISSING MANY ELECTRICAL PARTS FOR OUR TEMPTER TENTS. WE NEED 17 SETS OF ELECTRICAL PARTS TO PROVIDE POWER TO OUR ERECTED TENTS, PARTS ON ORDER. (7) 21 MORE AIR CONDITIONERS/HEATERS TO FINISH OUR TENT CITY. ALSO REQUEST AN ADDITIONAL 9 A/C AND HEATER UNITS TO AIR CONDITION CRITICAL OPERATIONAL AREAS HOUSED IN OLD AIRCRAFT BUNKERS. AWAITING SOURCING FROM CENTAF. PAGEE 05 RHIDFK0254 (8) 2 SEWER TRUCKS, 15 PORTABLE LATRINES, 1 WATER TRUCK AND 1 DEISEL FUEL TRUCK. (9) 24 VOLT GENERATORS FOR PLASI. SOURCED AWAITING EDD. (10) 5O EA BLUE TAXIWAY GLOBES. (11) NEED ONE TEMPTER TENT AND A/C UNIT FOR PORTABLE TACAN. THIS IS AN SC REQUIREMENT. J. LIMFACS: NONE AT THIS TIME; HOWEVER, ITEMS 1,2,4 ABOVE COULD BECOME CRITICAL IF CURRENT SITUATION CHANGES AND ITEM 7 WILL BECOME CRITICAL IF ADDITIONAL PERSONNEL ARE ASSIGNED TO SITE. 2. (U) FIRE PROTECTION A. FIREFIGHTERS ASSIGNED: 48 PROJECTED: 0 B. VEHICLES: 4 EA P-4'S 1 EA P-l9B, P-13, P-20. STATUS: 1 EA P-4 OUT-OF-SERVICE (ALTERNATOR) P-20, NO RESERVICING CAPABILITY. HAVE SOURCED KIT AWAITING TRANSPORTATION. C. (U) EQUIPMENT/SUPPLIES (1) FILGHTLINE EXTINGUISHERS: 14 EA, 150 LBS (2) AFFF: 2465 GALS ROUTINE PAGE: 3
Document Page: First | Prev | Next | All | Image | This Release | Search