Document Page: First | Prev | Next | All | Image | This Release | Search
File: aaanb_02.txtROUTINE PAGE: 2 VOLTAGE LINES TO OPS FACILITIES. COMMERCIAL AVAIL/CAP: NONE DISTRIBUTION SYS CAP: INSTALLED/OPERATIONAL. GENERATOR QTY/CAP: 3-5 KW, 8 EA 60 KW, 11 EA 100 KW, 3 EA 750 KW. D. ATH HOSP STATUS: ONE CLINIC ERECTED. ALSO ONE TENT HAS BEEN ERECTED AS A WARD. AIR TRANSPORTABLE HOSPITAL (ATH) NOT ON STATION PAGE 03 RHIDFKA0129 E. (U) VEHICLE STATUS: 3 USAF 4x4 P.U IN USE AND LOCAL RENTAL OF 8 GENERAL PURPOSE VEHICLES. LOCAL RENTAL: 2 DUMP TRUCKS, 1-2.5 CM LOADER, 1 ROAD GRADER, .7 CM EXCAVATOR. USAF VEHICLES: 2 EA 13 TON AT FORK LIFTS, 2 EA SEWER PUMPING TRAILERS, 1 EA D-7 DOZER, 2 EA TON TRACTOR, 1 EA 40 FOOT TRAILER, 1 EA TILT TRAILER, 3 EA FLIGHTLINE SWEEPERS. F. RRR CAPABILITY: NONE. 16 BUNDLES OF AM-2 MATTING ON SITE. NO KEYLOCKS. WE UNDERSTAND BUNDLES WERE SENT FOR FLOORS SHELTERS. G. AIRFIELD STATUS: PAVE COND/CAP:LCN 75 BARRIERS: 2 BAK 12;S 2 BAK 14'S NAV AIDS: RUNWAY AND MAIN TAXI LIGHTS EXIST BUT ARE NOT MARGINAL FOR NIGHT OPERATION. AN AIRFIELD LIGHTING SYSTEM AND PLASI HAVE ARRIVED, AND WE STARTED INSTALLING TODAY. 24 VOLT GENERATORS FOR PLASI NOT ON SITE. USAF PORTABLE TACAN IS OPERATIONAL. INSTRUMENT LANDING SYSTEM HAS BEEN FLIGHT CHECKED AND IS OPERATIONAL. H. TENT CITY STATUS: WE MOVED INTO TENT CITY LAST THURSDAY, FRIDAY, AND SATURDAY. CURRENTLY ALL SYSTEMS ARE OPERATIONAL WITH ONLY THE WATER PLANT CHLORINATION MARGINAL. THE FOLLOWING PAGE 04 RHIDFKA0129 TEMPTER TENTS HAVE BEEN ERECTED: BILLETING (PERMANENT PARTY/ TRANSIENTS) - 85; OFFICES -18; SV/MWR AAFES -8; DINING HALL -1; SHAVE/SHOWER/LATRINES - 8; CLINIC - 2. ONE SHELTER HAS BEEN ERECTED WITH THREE LEFT. THREE TEMPTER TENTS STILL NEED ROUTINE PAGE: 2
Document Page: First | Prev | Next | All | Image | This Release | Search